Posted on Mar 24, 2018, 3:11 PM
Tank pump jib cranes South Pars Gas Field Development in Iran
Posted on Mar 24, 2018, 3:11 PM
Tank pump jib cranes South Pars Gas Field Development in Iran
Posted on Jun 9, 2017, 2:22 PM
5t x 18m Ex Pillar Jib Crane - Chevron Nigeria Sonam Pipeline & Okan PRP
Posted on Oct 20, 2016, 9:12 AM
Yamal is one of the most complex liquefied natural gas (LNG) projects ever undertaken because of its location above the Arctic Circle, a region that is icebound for 7 to 9 months of the year.
Posted on Apr 15, 2016, 3:14 AM
Cranes for the Arctic region to operate in temperatures dropping to -50°C.
Posted on Apr 15, 2016, 3:14 AM
LNG Tank Pump handling Jib Cranes for Wheatstone LNG Project at Onslow site in Western Australia
Posted on Mar 10, 2016, 6:18 AM
Eilbeck Cranes has successfully completed Factory Acceptance Testing and delivered 5 cranes capacity ranging from 5t to 70t(50t+50t) Cranes for DSME for FPSO for the Ichthys LNG offshore Project.
Posted on Nov 21, 2013, 3:14 AM
When it was realised that the market was limited in what was available in the way of cable catenary systems for Hazardous and Explosive atmospheres, we set upon a path to design, manufacture and obtain IEC EX and ATEX certification for our own in-house product which would satisfy our needs and surpass our clients expectations.
Posted on Apr 15, 2016, 3:14 AM
The cranes have undergone a rigorous project quality and hazardous area electrical inspection regime by the client, all cranes having been converted from European Standard compliance to Australian Standard IEC EX compliance requirements for Explosion protection cranes.
Posted on Apr 15, 2016, 3:14 AM
The new rig is capable of testing underslung cranes up to 12.5T capacity in all motions. Initially designed and built to meet the requirement of full load testing of cranes for Ichthys LNG project’s offshore cranes for DSME on the FPSO & CPF, the rig has already been utilised to fully test a 10T Explosion proof underslung crane.
Posted on Sep 9, 2012, 11:08 AM
Eilbeck Cranes delivers 4x 6.3m ELK Cranes to Fluor GLNG Upstream Project in Queensland, Australia.
Posted on Aug 19, 2013, 11:08 AM
The GLNG Project is a pioneering initiative to convert coal seam natural gas (CSG), or coal bed methane as it is sometimes referred to, to liquefied natural gas (LNG) for export to global markets.
Posted on Sep 27, 2012, 2:05 PM
Eilbeck Cranes accepted the challenge for the most difficult design, QA, manufacture Eilbeck Cranes has undertaken and it looks forward but has full confidence in its team to delivery the product required by the client.
Posted on Sep 14, 2012, 2:16 PM
Eilbeck Cranes has won a new order that is one of the largest single crane contracts to be let in Australia over the past 40 years.
Posted on Nov 21, 2013, 3:14 AM
Eilbeck Cranes has won a new order for the re‐construction of Skikda LNG / LPG plant after the massive explosion occurred in January, 2004.
Posted on Feb 9, 2012, 11:08 AM
Manufacture and delivery of the first two Ex Zone 1 classification cranes designed to operate in hazardous conditions. In total, 15 overhead cranes are scheduled for delivery over the next 12 months.
Posted on Aug 19, 2013, 11:08 AM
The GLNG Project is a pioneering initiative to convert coal seam natural gas (CSG), or coal bed methane as it is sometimes referred to, to liquefied natural gas (LNG) for export to global markets.
|
|
|
|
|
Sydney
6 Moorlands Road
Ingleburn NSW 2565
Phone: 61 (02) 9829 3700
Newcastle
1/50 Sandringham Avenue
Thornton NSW 2322
Phone: 61 (02) 4966 8022
Brisbane
3/12 Sudbury Street
Darra QLD 4076
Phone: 61 (07) 3376 8255
Mackay
32 Diesel Drive
Paget QLD 4740
Phone: 61 (07) 4998 5599
Perth
28 Jackson Street
Bassendean WA 6054
Phone: 61 (08) 9279 4800
Adelaide
2/23 Clovelly Avenue
Royal Park SA 5014
Phone: 61 (08) 8162 5150
Melbourne
321 Doherty’s Road
Truganina VIC 3029
Phone: 61 (03) 9369 7444